If you’re planning a kitchen renovation, one of the most important questions is: how long will the whole project take?
Providing an estimated timeline isn’t always straightforward, and several factors come into play. However, at Ashford Kitchens & Interiors, we can typically install a new kitchen in around 9 – 11 weeks after an order is placed, although lead times can vary depending on factory and installation capacity. Once the physical work begins, a full kitchen installation usually takes around 3 – 4 weeks, depending on the size, design, and overall scope of the project.
These dates provide a useful starting point, but every renovation is different. Here’s what you can realistically expect from the process, along with factors that can influence how long it takes.
Before Ordering Your New Kitchen
A kitchen renovation timeline starts before anything is ordered, delivered or installed. The first stage involves understanding what you want from the room. Our kitchen designers look at how your current kitchen works, what you want to improve, and how the new space needs to suit your day-to-day life. This could involve exploring different layouts, cabinetry styles, appliances, worktops, finishes, and storage options.
There’s no fixed timeframe for this part of the process as homeowners approach it differently. You might already know exactly what you want, or you might need time to compare different ideas before making final decisions. Both are completely normal. However, we would always recommend giving yourself plenty of time at this stage. It’s much easier to change things while the kitchen is still being designed than after you’ve placed an order.
If you already have an ideal completion date in mind, this is also the best time to tell us. We can then work backwards and help you understand when decisions need to be made and when the order should ideally be placed to make this happen.

9 – 11 Weeks From Order to Installation
Once the design is signed off, we can order the kitchen and begin installation planning. At Ashford Kitchens & Interiors, we can typically plan installation for about 9 – 11 weeks after the order is placed. This period allows time for the kitchen to be manufactured, appliances to be delivered, and the installation schedule to be coordinated.
It’s important to treat this timeframe as a guide rather than a fixed promise. Lead times can change depending on how busy our factory and installation teams are, while individual products can also have their own delivery schedules. Bespoke elements, certain appliances or specialist materials can sometimes need additional time. Once we know exactly what your kitchen includes, we can give you a much clearer idea of how your own schedule is likely to look.
The Installation Process
For a full kitchen installation, we would usually allow around 3 – 4 weeks, though this can vary based on your project. The process includes removing your old kitchen, plumbing and electrical adjustments, fitting cabinetry and appliances, and installing custom worktops, which can sometimes add time depending on the material. Finishing touches, such as backsplashes and final connections, complete the installation.
The exact duration will depend on the room and the scope of the renovation. A relatively straightforward kitchen replacement will usually progress differently from a larger project involving integrated appliances and an island. While the main fitting can be completed within weeks, custom materials and structural changes can extend the timeline. This is why we prefer to provide project-specific guidance once we understand exactly what’s involved in the project.
How Long Will You Be Without a Working Kitchen?
For many homeowners, this is a more important question than the overall project length. If you’re having a full kitchen renovation, you should expect a period when you can’t use certain facilities. Our typical 3 – 4 week installation timeframe can help with planning, but it doesn’t necessarily mean you will be without every part of the kitchen for the full duration.
The level of disruption depends on the extent of the renovation and the sequence of work. There might be periods where the sink is unavailable, appliances are disconnected, or worktops haven’t yet been installed. So, setting up a small temporary kitchen elsewhere can make this stage much easier. A kettle, microwave, toaster and small fridge can give you a base for simple meals while the main kitchen is being worked on.

What Affects the Timeline of a Kitchen Renovation?
There are several reasons a project can go beyond the average timeframe.
Changes to the Layout
Moving plumbing, appliances or electrical points may require additional preparation work before installation begins. This is usually identified and planned for during the design stage, allowing the project schedule to account for any necessary work. In many cases, these changes can significantly improve how the kitchen functions for everyday living.
Structural Work
If your kitchen project is part of a wider renovation, extension or structural alteration, the installation timeline will often depend on the progress of the building works. We work closely with homeowners and their builders to help coordinate timings and ensure the kitchen is fitted at the appropriate stage of the project.
The Size and Complexity of the Kitchen
A larger or more detailed kitchen can take longer to install simply because it involves more. An island, tall cabinetry, integrated appliances or more complex fitted furniture can all add to the installation process. The key point is that when you incorporate these features into the design, the kitchen may need more time to be fitted properly.
Worktop Choice
Many premium stone, quartz and porcelain worktops are individually templated after the cabinetry has been installed. This ensures a precise fit and flawless finish. Once templated, the worktop is manufactured to your exact dimensions before final installation, which forms a normal part of the project timeline.
The Existing Room
As part of our design process, we carry out a site survey to identify any considerations before installation begins, allowing most aspects of the project to be planned well in advance. Occasionally, particularly in older properties, additional work may only become apparent once existing flooring, cabinetry or services have been removed. Should this arise, we’ll discuss the options with you and agree on the best approach before work continues.
Finalising the Design
Taking the time to finalise your design, materials and appliance selections before ordering helps ensure the project progresses smoothly. Our design process is intended to give you confidence in every decision before manufacturing begins.
How Far in Advance Should You Start Planning?
Usually, earlier than you think. If you have a particular date when you’d ideally like the new kitchen completed, it makes sense to start discussing the project several months beforehand.
Remember that our typical 9 – 11 week timeframe begins once the kitchen has been ordered. Before that, you still need time for the showroom visit, initial consultation, measurements, design development and final decisions. For larger renovations involving structural work or an extension, start even earlier, especially when the kitchen installation needs to coordinate with builders or other trades.
Starting early also gives you more time to enjoy the design process, rather than feeling pressured to decide on key elements just because an installation deadline is approaching.

A Simple Kitchen Renovation Timeline
Although every kitchen is different, the overall journey usually looks something like this:
- Planning and design: Consultation, measuring, layout and product selection. The timeframe varies depending on the project and how quickly you make decisions.
- Order placed: Your kitchen moves into production and installation planning begins. This typically takes 9 – 11 weeks, depending on current factory lead times, installation capacity and the individual specification.
- Installation: A full kitchen installation usually takes around 3 – 4 weeks, including preparation, cabinetry fitting, worktops, appliances, final connections and finishing work. More complex projects, structural changes or specialist products can extend this.
Once we know exactly what you’re planning, we can provide a much clearer project-specific schedule for your kitchen renovation.
Planning Your Kitchen Renovation with Confidence
Overall, a kitchen renovation takes time because several important stages sit between choosing your initial design and enjoying the finished room. As a general guide, we can typically install a new kitchen around 9 – 11 weeks after your order is placed, with a full installation usually taking around 3 – 4 weeks. The exact timeline depends on the kitchen itself, the preparation required, and the products and materials you choose.
At Ashford Kitchens & Interiors, we manage the process from the initial design through to installation and completion. By understanding the full scope of your project from the start, we can set realistic expectations and explain what’s likely to affect your schedule.
If you’re starting to plan a new kitchen, or you have a particular completion date in mind, speak to our team early. Once we understand your property, your design and the work involved, we can give you a much clearer idea of what your own kitchen renovation timeline could look like.